Home / सरकारी organisation के रिज़ल्ट व jobs / NLC Recruitment 2017 | Latest Results, Syllabus, Hall Ticket

NLC Recruitment 2017 | Latest Results, Syllabus, Hall Ticket

NLC Neyveli Lignite Corporation India Limited 

Latest Jobs

NLCIL Fullform Neyveli Lignite Corporation India Limited
Type ‘Navratna’ – A Government of India Enterprise
Industry Energy
Founded 1956
Headquarters Neyveli, Tamil Nadu, India
KeyPerson Dr. Sarat Kumar Acharya, CMD
Products electricity generation and distribution, hydroelectricity, wind power, energy trading
Address Registered Office: First Floor, no. 8 Mayor Satyamurthy road, FSD, Egmore complex of Food Corporation of India, Chetpet, Chennai-600031, TamilNadu, India
Contact Ph : 044-28364613, 614, 615, 616, 617
Website www.nlcindia.com

About NLCILNeyveli Lignite Corporation India Limited (NLCIL) is a ‘Navratna’ profit making, Government of India Entreprise engaged in mining of lignite and generation of power through lignite based thermal power plants. NLCIL was established by GoI in 1956, following the discovery of lignite deposits in Neyveli, Tamil Nadu. NLCIL comes under administrative control of Ministry of Coal, GoI and serves as an important source of power generation to the states of Tamil Nadu, Andhra Pradesh, Karnataka, Kerala, Telangana, Rajasthan and Union Territory of Puducherry. NLCIL currently operates four open-cast lignite mines of a total capacity of 30.6 Million Tonnes per Annum (MTPA) and five thermal power stations with a total installed capacity of 3240 MW. The company, through its subsidiary NTPL, has also recently commissioned a 1000 MW coal based power plant (comprising 2 Units of 500 MW capacity each), 10 MW solar plant and 30 MW wind power plant thus bringing the total installed capacity of the company to 4280 MW.

The main activities of NLC are Lignite Mining and Power Generation. However, the company has also diversified into the generation of renewable energy through Solar Power Generation and Wind Power Generation.

The Business portfolio of the company is as under:

  1. Lignite Mining
  2. Thermal Power Generation
  3. Solar Energy Generation
  4. Wind Power Generation
  5. Coal Mining

POWER PROJECTS: NLC India has five pithead Thermal Power Stations with an aggregate capacity of 3240 MW. Further, NLC India has so far installed 29 Wind Turbine Generators of capacity 1.50 MW each and also commissioned 10 MW Solar Photo Voltaic Power plant in Neyveli, resulting in an overall power generating the capacity of 3287.5 MW(excl. JVs).

Power Plants Capacity ( in MW )
TPS – I 600
TPS – II 1470
TPS – I Expansion 420
Barsingsar TPS 250
TPS – II Expansion 500
Wind Power Plant 43.5
Solar Power Plant 10
THERMAL POWER STATION-I: The 600 MW Neyveli Thermal Power Station-I in which the first unit was synchronized in May’62 and the last unit in September’70 consists of six units of 50 MW each and three units of 100 MW each. The Power generated from Thermal Power Station-I after meeting NLC’s requirements is supplied to TANGEDCO, Tamil Nadu which is the sole beneficiary. Due to the aging of the equipment / high-pressure parts, Life extension program has been approved by GOI in March 1992 and was successfully completed in March’99 thus extending the life by 15 years. In view of the high grid demand in this region, this power station is being operated after conducting Residual Life Assessment (RLA) study. GOI has sanctioned a 2×500 MW Power Project (Neyveli New Thermal Power Plant – NNTPS) in June 2011 as the replacement for existing TPS-I.

THERMAL POWER STATION-II: The 1470 MW Second Thermal Power Station consists of 7 units of 210 MW each. In February 1978, Government of India sanctioned the Second Thermal Power Station of 630 MW capacity (3 X 210 MW) and in Feb.’83, Government of India sanctioned the Second Thermal Power Station Expansion from 630 MW to 1470 MW with an addition of 4 units of 210 MW each. The first 210 MW unit was synchronized in March 1986 and the last unit (Unit-VII) was synchronized in June’93. The power generated from Second Thermal Power Station after meeting the needs of Second Mine is shared by the Southern States viz., Tamil Nadu, Kerala, Karnataka, Andhra Pradesh and Union Territory of Pondicherry.

THERMAL POWER STATION-I Expansion: Thermal Power Station-I has been expanded (2 x 210 MW) using the lignite available from Mine-I Expansion. The scheme, TPS I Expansion, was sanctioned by Government of India in February 1996. Unit-I was synchronized in October 2002 and Unit-II in July 2003. The power generated from this Thermal Power Station, after meeting the internal requirements, is shared by the Southern States viz., Tamil Nadu, Kerala, Karnataka, and Union Territory of Pondicherry.

BARSINGSAR THERMAL POWER STATION: Government of India sanctioned the Barsingsar Thermal Power Station 250 MW (2 X 125 MW) in October 2004. The units were commissioned in December 2011 and in January 2012. The power generated from this Thermal Power Station after meeting internal requirements is shared by the DISCOMS of the state of Rajasthan.

TPS-II EXPANSION: This Project is consisting of two units of 250 MW capacity each. Unit-II attained commercial operation in April 2015 and Unit-I in July 2015. The lignite requirement is met through the expansion of Mine-II. The steam generators of this project employ eco-friendly Circulating Fluidised Bed Combustion (CFBC) technology. This technology has been adopted for 250 MW Capacity units for the first time in India

MINING PROJECTS: NLC India at present has four open-cast lignite mines namely Mine I, Mine II, Mine-IA and Barsingsar Mine. The lignite mined out is used as fuel to the linked Pithead power stations. Also, raw lignite is being sold to small-scale industries to use it as fuel in their production activities.

NLC RECRUITMENT

Senior Resident – NLC – Post Graduate

Designation Name : Senior Resident

Total Vacancies : NA

Location : Neyveli (Tamil Nadu) – India

Click here for more jobs in tamil-nadu

More Details

Age Limit : Minimum age limit is 30 years as on 01.06.2017
Age Relaxation: NA
Pay Scale : Rs. 55000/- Per Month
Nationality : Indian
Minimum Qualification: Pass in MBBS with CRRI of completion in Diploma / Degree PG) 2 General / Medicine Emergency / Diabetology / Medicine & Obstetrics / Paediatrics / ENT / Gynaecology / Anaesthesiology / Radiology / Ophthalmology / Orhopaedics Psychiatry
Click here for more post-graduate Jobs
Selection Process : Selection Will be based on Personal Interview.
Application Fee : NA
Application Mode : Apply Offline
How To Apply : Interested Candidates may appear for Interview along with prescribed application form with a passport size colour photograph, all the Original certificate including community certificate, a set of Photostat copy of all certificate at the time of Interview.

Note:-
Venue of Interview : General Hospital, NLC India Ltd., Neyveli.

Important Dates

Application Opening Date : NA
Application Closing Date : 14-Jun-2017
Last Date for Challan Generation : NA
Last Date for Payment of Fee : NA
Date of Exam : NA
Date of Interview : 14.06.2017 at 09.00 Hrs

Important Links

Online Apply Link : Click Here
Download Application Form : Click Here
Official Website URL : Click Here
Official Advertisement Link : Click Here
Detail Guidelines Link : Click Here
Qualification Detail Link : Click Here

——————————

Junior Resident – NLC – Post Graduate

Designation Name : Junior Resident

Total Vacancies : NA

Location : Neyveli (Tamil Nadu) – India

Click here for more jobs in tamil-nadu

More Details

Age Limit : Minimum age limit is 28 years as on 01.06.2017
Age Relaxation: NA
Pay Scale : Rs. 37500/- Per Month
Nationality : Indian
Minimum Qualification: Pass in MBBS with CRRI of completion.
Click here for more post-graduate Jobs
Selection Process : Selection Will be based on Personal Interview.
Application Fee : NA
Application Mode : Apply Offline
How To Apply : Interested Candidates may appear for Interview along with prescribed application form with a passport size colour photograph, all the Original certificate including community certificate, a set of Photostat copy of all certificate at the time of Interview.

Note:-
Venue of Interview : General Hospital, NLC India Ltd., Neyveli.

Important Dates

Application Opening Date : NA
Application Closing Date : 14-Jun-2017
Last Date for Challan Generation : NA
Last Date for Payment of Fee : NA
Date of Exam : NA
Date of Interview : 14.06.2017 at 09.00 Hrs

Important Links

Online Apply Link : Click Here
Download Application Form : Click Here
Official Website URL : Click Here
Official Advertisement Link : Click Here
Detail Guidelines Link : Click Here
Qualification Detail Link : Click Here

NLCIL RESULT

NLCIL ADMIT CARD

NLCIL SYLLABUS

Latest Government Jobs

[Total: 0    Average: 0/5]

About Amit Bhardwaj